Introduction
A modular system is meant to contain your entire process. It can be a water-for-injection (WFI) distribution skid or a custom process for your operation. When a manufacturer takes responsibility of your equipment requirements at their facility, you can minimize your risks while maximizing your speed to market. Below are examples of how a skid-mounted system could benefit your next project.
Reduced Time to Start-Up
Modular skids are ideal for your tight schedule as they drastically reduce the system set-up time by eliminating the need for multiple vendors or the stick-built process. Sole sourcing from one vendor reduces the time and labor poured into evaluating bids, purchase orders, specs, change orders, and documentation for multiple pieces of equipment. When a modular system is implemented, the design, fabrication, and testing of your equipment will be simultaneous with the construction of your building, resulting in a vastly reduced set-up time. Your equipment’s completion can be scheduled to fit in your ideal time frame so your facility can remain open for installation for the appropriate amount of time, eliminating or reducing downtime.
The International Society of Pharmaceutical Engineers (ISPE) performed a case study on two units in an oral dosage facility in Puerto Rico to see how having a modular facility affects schedule. The modular facility was completed faster by more than six months than the stick-built facility.
Reduced Labor Risk
Modular skids are also ideal for areas lacking local resources, as sourcing a skid can compensate for the lack of welders or grinders in your area. Bringing in these craftsmen dramatically increases project pricing through travel and housing expenses, while manufacturing experts working at a controlled site eliminates the hassle of searching for qualified craftsmen.
Maintenance of Higher Quality Standards
Fabrication and validation of your equipment should be performed in an orderly and controlled shop environment. Your manufacturer’s facility should have final assembly and test areas that are climate-controlled and isolated from welding and grinding areas. Your supplier will be held accountable for managing your project’s multiple needs, resulting in cohesive quality and reliability throughout all parts of your equipment. You should expect your equipment to be fully tested in a proper environment before shipment, preventing any issues on-site.
Improved Documentation
Modular skid documentation will come in binders with consistent documentation, forms, and shipment times. A modular skid turnover package (TOP) is easier to understand and keep track of than multiple TOPs from various vendors. Documentation will be formatted in the same template throughout, and you don’t need to worry about varying arrival times and physical forms. Individual equipment within the skid will have its own TOP. These TOPs can then reference one another, providing uniformity and clarity. Using multiple vendors means multiple TOPs, which could be confusing and disconnected.
More from Mueller Academy
- Introducing Our New Membrane-Based Water for Injection (WFI) Skids
- Manway Gasket Installation & Bushing Adjustment
- How to Decide Between a Horizontal & Vertical Milk Tank
- MES & PSG Feedwater Quality Requirements
- On-Site Tank Fabrication Under Deadline
- Finding the Right Finish: Understanding Polishing
- Increase the Capacity of Your Clean Utility Equipment
- Balancing a Mueller Multiple Effect Still (MES)
- The Different Types of Steam in Industrial Steam Generation