Tank Top Replacement

Unfortunately, bad things can happen to perfectly good tanks and silos. Often, they happen when you least expect it. Thankfully, you can count on Paul Mueller Company's trusted vendor network to assess your crisis, replace your tank or silo tops, and have you up and running again.

We can build replacements of the damaged sections and, with the help of our service and installation partners, deliver and install them. Within a minimum of one week from the replacement, they also conduct dye penetrant testing of your tanks or silos to ensure the integrity of your equipment.

Certified Repairs

  • Repairs can meet ASME Code, API, and 3-A Standards

Capabilities

  • Concept, Design, Install
  • Engineering Capabilities
  • Manway Repair/Replacement
  • Heat Transfer Leaks
  • Catwalks, Ladders, Platform Repairs
  • Dye Penetrant Testing
  • Material Thickness Verification
  • Material Finish Verification
  • Borescoping Pipes and Tubes
  • Vessel Relocations
  • Vessel Removal
  • Vessel Inspections
  • Vessel Re-Ratings
  • Vessel Modifications
  • OSHA Requirements
  • ISNetworld, Ariba, Browz Member
  • ASME, API and 3-A Standards
  • FEA Capabilities

We Stand By Our Name...and Yours

When Paul Mueller said "The best compliment a customer can give us is another order" we took that to heart. If we don't do our job well, you can't do your job well. It is this pride of craftsmanship and customer service that has led us to be an industry leader in processing equipment manufacturing and services since 1940. We are honored to be trusted by these valued customers.