PyroPure Service Agreements

You are proactive and know how important it is to take care of your pharmaceutical equipment over the years. Downtime isn't an option. That's why Paul Mueller Company is ready to assist and schedule service on your timeline.

We offer 3 levels of routine maintenance (see bullets below) and can put these on your calendar during a planned shutdown:

  • Level 1 Inspection - recommended every 6 months or 2,000 hours
  • Level 2 Preventative - recommended annually or 4,000 hours
  • Level 3 Complete - recommended every other year or 8,000 hours

Three peace-of-mind plans to keep facilities operating up to the strict standards your industry requires.

Certified Repairs

  • Our repairs can meet ASME Code, API and 3-A Standards

Inspection

  • Visual Inspection
  • Float Ball Inspection
  • Clean Steam Strainer
  • Clean Cooling Water Strainer
  • Feed Water Conductivity Probe Visual Check
  • Distillate Conductivity Probe Visual Check
  • Startup
  • Leak Check
  • Alarm Function Test
  • Adjust & Tune as Necessary
  • Document Current Settings
  • Service Report

Preventative

  • Visual Inspection
  • Change All Gaskets
  • Replace Float Balls
  • Rebuild Steam Traps
  • Replace Steam Strainer
  • Replace Cooling Water Strainer
  • Visually Check Feed Water Conductivity Probe
  • Visually Check Distillate Conductivity Probe
  • Replace Feed Water Valve Diaphragms
  • Replace Sample Valve Diaphragm
  • Replace Orifice Discs & Gaskets
  • Check and Replace Valves
  • Replace Inlet Air Filter
  • Startup
  • Leak Check
  • Alarm Functional Check
  • Adjust and Tune as Necessary
  • Document Current Settings
  • Service Report

Complete

  • Visual Inspection
  • Change All Gaskets
  • Replace Float Balls
  • Rebuild Steam Traps
  • Replace Steam Strainer
  • Replace Cooling Water Strainer
  • Visually Check Feed Water Conductivity Probe
  • Visually Check Distillate Conductivity Probe
  • Replace Feed Water Valve Diaphragms
  • Replace Sample Valve Diaphragm
  • Check and Replace Valves
  • Replace Inlet Air Filter
  • Replace Evaporator Seals
  • Rebuild Steam Control Valve
  • Rebuild Temperature Control Valve
  • Replace Rupture Disc
  • Replace Burst Sensor
  • Startup
  • Leak Check
  • Alarm Functional Check
  • Adjust and Tune as Necessary
  • Document Current Settings
  • Service Report

Hydrotest Option

  • In addition to the Level 2 or Level 3 service visit it may be wise to test the steam components to make sure they are still holding up to the vigorous activity of producing Pure Steam. 
  • The hydrotest option runs those components through the rigors that are key to the Pure Steam Generators operation

We Stand By Our Name...and Yours

When Paul Mueller said "The best compliment a customer can give us is another order" we took that to heart. If we don't do our job well, you can't do your job well. It is this pride of craftsmanship and customer service that has led us to be an industry leader in processing equipment manufacturing and services since 1940. We are honored to be trusted by these valued customers.